In a recent government meeting, the proposal for a four-lot subdivision at 1921 Parade Road in Maconia was unanimously accepted, marking a significant step in local development. The project, presented by engineer Sarah Warty from Du Bois and King, involves the demolition of an existing residential structure and barn, which have been largely abandoned, to create four new single-family lots.
The subdivision will utilize Clover Lane for access, ensuring that no new driveways will open onto Parade Road, in compliance with a variance granted earlier this year. This variance allows for the creation of lots smaller than the typical two-acre minimum, a decision made to maintain the rural character of the area. The proposal includes measures to restore existing paved and gravel surfaces to a vegetated state, thereby reducing overall impervious surfaces.
Concerns regarding drainage were addressed, with plans for foundation underdrains and a rain garden to manage runoff from the new homes. The project aims to mitigate any potential erosion issues by connecting drainage systems to existing infrastructure.
Additionally, the new homes will be connected to municipal water and sewer systems, with careful planning to preserve mature trees along Clover Lane, as requested by local residents. The developer has committed to working with the post office to ensure adequate mailbox space for the new homes.
The meeting highlighted the importance of community input, as several residents raised concerns about mailbox placement and the potential impact on local trails. The developer reassured attendees that they would collaborate with relevant authorities to address these issues.
Overall, the acceptance of this subdivision proposal reflects a proactive approach to local development, balancing growth with community needs and environmental considerations.