In a recent government meeting, officials discussed critical infrastructure issues, particularly focusing on road and bridge repairs within the township. The meeting highlighted the allocation of $1 million for township road improvements, emphasizing the need for urgent attention to deteriorating bridges, including the Ferry Road, Swan Island, and Elba Island bridges, which are vital for local residents.
Officials expressed concern over the condition of these bridges, noting that they are essential for community access. The discussion included plans for resurfacing Meridian Road, with expectations to complete the paving within the current construction season, which ends in mid-November. However, the timeline is contingent on repairs to pressure plates on the bridge that would restore its load limit.
The board also considered inviting county representatives to discuss these infrastructure challenges directly, aiming to foster a collaborative relationship rather than relying solely on written communication. The importance of addressing safety issues related to the bridges was underscored, particularly for pedestrians and cyclists.
Looking ahead, the board is preparing for next year's road program, with a goal to finalize a list of projects by November. The proposed budget includes a mix of concrete and asphalt work, with a recommendation to prioritize concrete repairs due to the significant deterioration observed in various areas, including Park Lane and Manchester.
Overall, the meeting underscored the urgency of addressing the township's infrastructure needs, with officials committed to ensuring that necessary repairs are made to enhance safety and accessibility for residents.