City Council approves expansion for wastewater treatment plant led by Grant Watanabe

December 05, 2024 | Fair Oaks Ranch, Bexar County, Texas

Thanks to Scribe from Workplace AI , all articles about Texas are free for you to enjoy throughout 2025!


City Council approves expansion for wastewater treatment plant led by Grant Watanabe

This article was created by AI using a video recording of the meeting. It summarizes the key points discussed, but for full details and context, please refer to the video of the full meeting. Link to Full Meeting

The City of Fair Oaks Ranch is taking significant steps to enhance its wastewater treatment capabilities, as discussed in the December 5, 2024, City Council meeting. Public Works Director Grant Watanabe presented a detailed update on the Phase 1 expansion project for the wastewater treatment plant, emphasizing the need for a new work authorization to progress from 30% design to final design and construction.

The expansion project aims to address immediate needs, including upgrades to the effluent pump station, the bottom of the hill lift station, and improvements to headworks odor control. Watanabe highlighted that the project will involve comprehensive services such as project management, surveying, and utility coordination, with a total estimated cost of $4.1 million.

A key finding from a recent water balance study indicated that the city’s current permit limits for effluent application to the golf course would soon be exceeded. The study recommends amending the permit to allow for an increase from 2 acre-feet per acre to 4 acre-feet per acre, accommodating future growth.

The effluent pump station upgrade will see the replacement of existing pumps with more powerful submersible pumps, enhancing the system's efficiency. Additionally, the bottom of the hill lift station will be equipped with larger solids handling pumps to mitigate clogging issues, while the headworks will receive corrosion-resistant improvements to manage odors effectively.

This expansion is crucial for supporting the city's growth and ensuring that wastewater management keeps pace with increasing demands. The council's approval of the new work authorization is expected to facilitate these essential upgrades, paving the way for a more robust wastewater treatment infrastructure in Fair Oaks Ranch.

Converted from December 5, 2024 - City of Fair Oaks Ranch Regular City Council Meeting meeting on December 05, 2024
Link to Full Meeting

Comments

    View full meeting

    This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

    View full meeting

    Sponsors

    Proudly supported by sponsors who keep Texas articles free in 2025

    Scribe from Workplace AI
    Scribe from Workplace AI