Emma Willard School plans new faculty housing with demolition of Tangeman Hall

April 16, 2025 | Troy, Rensselaer County, New York

Thanks to Scribe from Workplace AI , all articles about New York are free for you to enjoy throughout 2025!


Emma Willard School plans new faculty housing with demolition of Tangeman Hall

This article was created by AI using a video recording of the meeting. It summarizes the key points discussed, but for full details and context, please refer to the video of the full meeting. Link to Full Meeting

The Troy Planning Board meeting on April 16, 2025, spotlighted a significant development project for the Emma Willard School, as representatives from Consigli Construction and SWBR presented plans for new faculty housing. The project involves the demolition of Tangeman Hall and the construction of four new buildings, totaling 12 housing units, aimed at enhancing faculty accommodations on campus.

Kevin Johnson from Consigli Construction outlined the project's timeline, expressing hopes to break ground in June 2025, with the goal of having the new units ready for occupancy by June 2026. The proposed buildings will be strategically located in the northeast section of the campus, set back 38 to 40 feet from the private drive to ensure adequate space and access.

Brian Dion from SWBR detailed the design, which includes 25 parking spaces—two per unit, with two designated as ADA accessible. Each unit will also feature a dedicated storage area and a designated space for waste and recycling. A playground is planned for the east side of the housing area, intended for use by all residents.

The project also addresses safety concerns, with plans to replace an existing gate on Pinewood Avenue to improve access for emergency services. The gate will be equipped with a sensor to automatically open during emergencies, ensuring swift entry for fire and police departments.

Civil engineer Ben Wolfling highlighted the project's compliance with stormwater management regulations and utility upgrades, including an increase in water line size to support fire hydrants. The development aims to integrate seamlessly with the existing campus infrastructure while promoting sustainability through features like bicycle parking and connections to pedestrian pathways.

As the project moves forward, the Planning Board expressed appreciation for the thorough presentation and collaboration, indicating a positive outlook for the upcoming construction phase. The anticipated faculty housing is expected to significantly enhance the living conditions for staff at Emma Willard School, marking a progressive step for the institution.

Converted from April 2025 Planning Board Hearing/meeting meeting on April 16, 2025
Link to Full Meeting

Comments

    View full meeting

    This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

    View full meeting

    Sponsors

    Proudly supported by sponsors who keep New York articles free in 2025

    Scribe from Workplace AI
    Scribe from Workplace AI