Restoration project at 55 Christopher Street plans 100% brick replacement due to damage

May 19, 2025 | Manhattan City, New York County, New York

Thanks to Scribe from Workplace AI , all articles about New York are free for you to enjoy throughout 2025!


This article was created by AI using a video recording of the meeting. It summarizes the key points discussed, but for full details and context, please refer to the video of the full meeting. Link to Full Meeting

The Manhattan Community Board 2 Landmarks Committee convened on May 15, 2025, to discuss significant restoration projects and applications affecting local architecture. The meeting focused on two primary agenda items: the restoration of 57 Christopher Street and a proposed storefront renovation at 62 Prince Street.

The first item addressed was the ongoing restoration project at 57 Christopher Street. The applicant presented a plan to remove all existing brick masonry from the south facade, spanning from the ground floor to the third floor. The proposal includes repairing and waterproofing the backup masonry before replacing it with new face brick that matches the brick approved for the restoration of 55 Christopher Street. The applicant explained that initial assessments indicated only a 50% brick replacement was necessary; however, further inspection revealed that the brick was unsalvageable, leading to a revised plan for a complete 100% replacement. The committee discussed the importance of maintaining architectural consistency, as the buildings in the area were believed to have been constructed simultaneously with similar materials.
final logo

Before you scroll further...

Get access to the words and decisions of your elected officials for free!

Subscribe for Free

Committee members raised questions regarding the waterproofing methods proposed for the backup masonry. The applicant clarified that a liquid waterproofing layer would be applied to protect against leaks, addressing concerns about potential moisture entrapment within the wall structure. The discussion highlighted the challenges of ensuring the integrity of the facade while adhering to modern restoration practices.

The second agenda item involved an application for 62 Prince Street, which proposed replacing the existing storefront and windows, installing a standing seam metal roof, and adding branded signage. The applicant also sought approval for a new glazed patio enclosure and metal planters along Prince Street. The committee reviewed the design elements and their compatibility with the surrounding architecture.

Family Scribe
Custom Ad
Overall, the meeting underscored the committee's commitment to preserving the historical character of Manhattan while accommodating necessary renovations. The discussions emphasized the importance of careful planning and execution in restoration projects to maintain the aesthetic integrity of the neighborhood. The committee will continue to evaluate these proposals in future meetings, ensuring that all developments align with the community's preservation goals.

Converted from Manhattan CB2 May 15, 2025 - Landmarks 2 Committee Meeting meeting on May 19, 2025
Link to Full Meeting

Comments

    View full meeting

    This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

    View full meeting

    Sponsors

    Proudly supported by sponsors who keep New York articles free in 2025

    Scribe from Workplace AI
    Scribe from Workplace AI