The Falmouth Zoning Board of Appeals convened on November 7, 2024, to discuss a significant application for a comprehensive permit for the Broken Bow Residences project, a proposed development aimed at addressing local housing needs. The project, which falls under Massachusetts General Laws Chapter 40B, seeks to create a mix of studio and two- to three-bedroom units on a 69,544 square-foot parcel of land located at 0 Broken Bow Lane.
The property is situated in two zoning districts: Agricultural B and General Residence, both of which have minimum lot size requirements that the proposed development exceeds. Currently, the land is vacant, and the project aims to transform it into a residential community with adequate parking and landscaping.
Key discussions during the meeting highlighted various aspects of the project. The engineering department provided extensive feedback, noting that the development will include private trash and snow removal services, as it will not be a town-maintained way. The Board of Health indicated that the proposed septic system appears suitable, while the wastewater department mentioned that the site could be connected to the sewer system as early as 2027.
Concerns were raised by the planning board regarding the architectural design of the buildings and the perceived lack of tenant storage facilities. They also expressed worries about the market rate rents, which they deemed high for the area. The project plans to include 32 parking spaces, exceeding the required number, with provisions for handicap accessibility.
As the meeting progressed, Nick Marione, representing the project owner, detailed the layout of the buildings and their features, including laundry facilities and storage options. He addressed questions from board members and community members, emphasizing the project's compliance with local regulations and its potential benefits to the community.
The discussions at this meeting reflect ongoing efforts to enhance housing availability in Falmouth, a pressing issue for many residents. As the board continues to evaluate the application, the outcomes will play a crucial role in shaping the future of housing in the area. The next steps will involve further review and consideration of community feedback as the project moves forward.