The Bonner County Board of Commissioners convened on August 27, 2025, to discuss several key issues, including a proposed dry well installation at the county jail and the purchase of a new patrol vehicle for the sheriff's office.
The primary focus of the meeting was the plan to install a dry well in the outdoor recreation area of the jail. This project aims to address ongoing drainage issues that have resulted in water accumulation during winter and spring months, rendering the area unusable. The undersheriff presented the project, which includes excavating a 10 by 10 by 9-foot pit, installing a dry well, and connecting it to the existing drainage system. The project has been approved by auditing and is funded within the jail budget.
Commissioners raised concerns about the effectiveness of the dry well, particularly regarding the soil type and potential groundwater issues. It was suggested that a test hole be dug prior to full excavation to assess the groundwater level and ensure the dry well's effectiveness. The board agreed to pause the project until further information could be gathered, emphasizing the importance of making informed decisions based on verifiable data.
In addition to the dry well discussion, the board approved the purchase of a 2025 Chevrolet Silverado for the sheriff's office at a cost of $50,594.32. This vehicle will replace a previously unavailable unit and is essential for the patrol fleet to ensure the safety of deputies while performing their duties.
The meeting also included discussions about a construction contract for obstruction removal at Sandpoint Airport, which was approved, and a temporary construction easement to facilitate access for the obstruction removal project. The easement allows the county to use adjacent land for heavy equipment without incurring additional costs.