Become a Founder Member Now!

BDD Realty proposes two commercial buildings with amended site plan at Eastpointe Drive

October 06, 2025 | Hooksett, Merrimack County , New Hampshire


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

BDD Realty proposes two commercial buildings with amended site plan at Eastpointe Drive
In the heart of Hooksett, New Hampshire, a significant development proposal took center stage during a recent Conservation Commission and Planning Board meeting. The air was filled with anticipation as members gathered to discuss BDD Realty LLC's ambitious plan for two commercial buildings on Eastpointe Drive, which promises to reshape the local landscape.

The proposal, which includes a total of 13 contractor units—six in the first building and seven in the second—was initially conditionally approved in 2023. However, the site layout has undergone substantial changes to comply with the New Hampshire Department of Environmental Services (DES) stormwater management requirements. A new detention pond has been introduced at the front of the property, closer to the 28 Bypass, marking a significant amendment to the previously approved plans.

As the meeting progressed, the board unanimously accepted jurisdiction over the application, acknowledging its potential regional impact. This decision set the stage for a public hearing where Brian Pratt, a civil engineer representing BDD Realty, detailed the revised site plan. The existing 5.2-acre lot, currently home to Eckhart and Johnson's facility, will see the addition of modern contractor bays designed with aesthetics in mind. The buildings will feature a blend of blue vinyl siding and stone masonry, aiming to enhance the visual appeal of the area.

One of the key discussions revolved around the landscaping plan, which initially proposed 14 trees, all deciduous. Board members expressed concerns about the lack of evergreen trees, which provide year-round coverage and visual interest. In response, a proposal was made to add three evergreen trees to the design, ensuring a more balanced and visually appealing landscape.

The meeting also touched on essential infrastructure considerations, including fire safety measures. While the buildings will not be equipped with sprinklers, plans are in place to facilitate future installations if needed. The developers assured the board that adequate fire hydrants would be installed on-site to meet safety regulations.

As the meeting drew to a close, the board members emphasized the importance of maintaining the natural beauty of Hooksett while accommodating growth. The proposed development not only aims to meet the needs of local businesses but also strives to enhance the community's aesthetic and environmental standards. With the board's approval, the project is poised to move forward, promising to bring new opportunities to the area while respecting the delicate balance of nature and development.

View full meeting

This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

View full meeting

Sponsors

Proudly supported by sponsors who keep New Hampshire articles free in 2025

Scribe from Workplace AI
Scribe from Workplace AI