Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Officials unveil conceptual plan and timeline for West Rox replacement school

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Architects presented a conceptual design for a new West Rox middle school during the Board of Education Facilities Committee meeting, estimating roughly 121,000 square feet for 720 students, an approximate $125 million preliminary cost and a multi-year timeline with state grant application steps.

Architects and school staff presented a conceptual plan for a replacement West Rox middle school and outlined a multi-year timetable for funding and construction. The plan envisions a roughly 121,000-square-foot building sized for 720 students, an assumed state reimbursement rate of 60 percent and a preliminary rough cost estimate presented to the committee as about $125 million. Michael Lusaso of Antonacci Associates described the scheme and phasing and said the design remains conceptual and will change when educational specifications are finalized. "This particular plan ... was a sequential addition and renovation of the existing…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans