Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Meeting Roundup topic
No spam. Unsubscribe anytime.
Fall River Conservation Commission meeting roundup: multiple notices of intent tabled; several orders issued or deferred
Summary
The Fall River Conservation Commission at its Oct. 6 meeting issued several formal decisions — including an Order of Conditions for 420 Airport Road and a partial certificate of compliance for Lot 7 at 21 August Street — and tabled many filings pending technical information or site access.
Get email alerts on the Meeting Roundup topic
No spam. Unsubscribe anytime.
The Fall River Conservation Commission met Oct. 6 at 1 Government Center and addressed a range of filings: notices of intent (NOIs), abbreviated and full ANRADs, certificates of compliance, and enforcement matters. Much of the evening’s work involved tabling items to allow applicants to provide additional materials; the commission also approved specific orders and a partial certificate of compliance.
Votes at a glance
- Bell Rock Road (silt removal site visit and methods) — Motion to table; outcome: tabled to next month. - Adopted fee structure (discussion) — Motion to table; outcome: tabled to next month. - Outstanding enforcement orders (Bart and Bronson Streets) — Motion to request Department of Environmental Protection intervention passed; item tabled for updates. - NOI SCDash24Dash843 (565 Detroit Street, inground pool) — Applicant requested tabling; motion passed to table. - NOI SCDash24Dash847 (121 Whitfield Street, single-family dwelling) — Applicant progress reported; motion passed to table. - ANRAD SEDash24Dash855 (Weavers Cove Industrial Park LLC; after-the-fact restoration) — Applicant requested site visit; motion passed to table. - NOI SCDash24Dash857 (Liberty Utilities 994 Jefferson Street, directional drilling) — Motion passed to table. - NOI SCDash24Dash859 (420 Airport Road, 69-space parking lot) — Commission issued Order of Conditions with special conditions (site plan review approval and wetland signage every 50 feet); outcome: approved. - Abbreviated wetlands delineation (0 Birch / 1205 Bay) — Applicant requested continuation; motion passed to table pending survey/invert info (see separate article). - Request for Certificate of Compliance SEDash24Dash829 (21 August Street; partial COC for Lot 7) — Commission approved issuance of a partial Certificate of Compliance for Lot 7 (Parcel C16-107); outcome: approved. - NOI SCDash24Dash863 (Atlantic West LLC, South Beacon Street; 7-building condominium/17 units) — Staff recommended Order of Conditions with two special conditions (wetland signage and resolution of outstanding comments); commission approved with stipulations; outcome: approved. - NOI SCDash24Dash862 (High Development LLC, Bay/Slade Streets; 9-unit townhouse development) — Extensive technical comments on slopes and infiltration rates; motion to table passed. - NOI (National Grid / Weavers Cove transmission line separation) — Applicant to provide full-size plans; motion to table passed. - ANRAD (Atlantic West LLC, riverfront resource delineation) — Commission issued an ANRAD acceptance/order (NREMAD) to lock in riverfront delineation; outcome: approved. - NOI SCDash24Dash864 (180 River Street marina expansion to add floats/slips) — Applicant presented a float-based dock plan and chapter 91 licensing intent; staff requested plan clarifications and public-access details; motion to table passed. - Enforcement discussion: SE-161 (372 Stevens Street) — Staff reported possible violation and recommended follow-up; owner engaged and commission agreed to table pending submission of COC/NRAD materials. - Enforcement discussion: 394 Kilburn Street (Cook Pond area) — Commission reiterated enforcement order and asked the owner to engage a consultant and submit a delineation; motion to table passed. - Approval of minutes (Sept. 8) — Motion passed. - Adjournment — motion passed.
Several items that were tabled included requests for additional survey data, full-size plans, peer-review site visits, or proof of landowner permissions. The commission repeatedly emphasized the need for clear technical information (invert elevations, survey staking, full-size plans) and for applicants to coordinate with utility or municipal owners where access is required.