Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Aldermen approve Kirk Farms amendment, add roundabout and require perimeter fence for Phase 1

5938150 · September 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Board approved amendments to the Kirk Farms planned residential development, moved some amenities and access, and cleared a Phase 1 preliminary plat of 53 lots with a board-added requirement that a perimeter fence be installed along the subdivision edge adjacent to existing homes.

Olive Branch — On Sept. 16 the Board of Aldermen approved amendments to the Kirk Farms planned residential development and granted preliminary plat approval for Phase 1, a 53-lot section that will be built off Goodman Road and Eastern Drive.

What changed: Staff said the amendments raise open space modestly (from about 72.44 to 75.14 acres), reduce the overall lot count by one (from 603 to 602) and shift lot-size mix toward larger minimum lots (fewer 6,000-square-foot lots and more 7,200-square-foot lots). The applicant also eliminated a proposed connector to Fox Bend Lane after floodplain studies showed potential flooding of about two existing houses if a culvert connection were installed.

Traffic and access: MDOT has required removal of at least one Highway 302 crossover near the site and asked the developer to construct an…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans