Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Petersburg awards Scout Bay generator design-build contract to Dawson Construction for $768,330
Summary
The Petersburg Borough Assembly approved a $768,330 design-build award to Dawson Construction for the Scout Bay Generator 2 project. The contract covers design work to advance the project from 30% to 95% and includes allowances for heavy equipment moves and commissioning; full construction is expected to be contracted in early 2026.
The Petersburg Borough Assembly voted Oct. 6 to award a design-build contract for the Scout Bay Generator 2 project to Dawson Construction LLC for $768,330.
The award covers design work that will take the project from a roughly 30% preliminary design to a 95% design, Utility Director Hagerman told the assembly. Hagerman said the firm proposing to do the detailed engineering is the same engineer that produced the current 30% design, which the borough…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

