Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Petersburg awards Scout Bay generator design-build contract to Dawson Construction for $768,330

5955629 · October 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Petersburg Borough Assembly approved a $768,330 design-build award to Dawson Construction for the Scout Bay Generator 2 project. The contract covers design work to advance the project from 30% to 95% and includes allowances for heavy equipment moves and commissioning; full construction is expected to be contracted in early 2026.

The Petersburg Borough Assembly voted Oct. 6 to award a design-build contract for the Scout Bay Generator 2 project to Dawson Construction LLC for $768,330.

The award covers design work that will take the project from a roughly 30% preliminary design to a 95% design, Utility Director Hagerman told the assembly. Hagerman said the firm proposing to do the detailed engineering is the same engineer that produced the current 30% design, which the borough…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans