Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Council adopts annual bridge certification required for state off-system bridge replacement program

5960085 · October 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Livingston Parish Council unanimously adopted a resolution certifying compliance with the Louisiana off-system bridge replacement program for Oct. 1, 2025 through Sept. 30, 2026, including establishing and posting road limits on participating bridges.

The Livingston Parish Council on Oct. 9 adopted an annual resolution certifying compliance with the State of Louisiana off-system bridge replacement program for the period Oct. 1, 2025 through Sept. 30, 2026.

Public-works staff said the parish participates in the state program by having local bridges inspected and load-rated; the resolution establishes road limits on bridges included in the off-system program and authorizes posting those limits. The action authorizes staff to send the certification to the Louisiana Department of Transportation and Development as required by the program.

Council members voted unanimously to adopt the resolution. Staff noted this is an annual administrative action that allows the parish to remain eligible for off-system bridge replacement funds and to set posted load limits where inspections indicate they are required.