Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Residential Development topic

No spam. Unsubscribe anytime.

Planning commission approves preliminary plat to add 27 cottage-style lots in Anthem at Merrill Ranch

5880396 · October 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Florence Planning & Zoning Commission voted to approve a preliminary plat to re-lot Unit 72 of Anthem at Merrill Ranch to add 27 smaller “cottage-style” home lots; Pulte representatives said the homes retain two-car garages and will fit the Sun City product line.

The Florence Planning & Zoning Commission on Oct. 2 approved a preliminary plat to re-lot Unit 72 in Anthem at Merrill Ranch, adding 27 lots to allow a smaller “cottage-style” home product to be offered in that unit (case PZ-25-78).

The change, presented by town staff and an engineer for the applicant, moves some internal lots and tract lines and relocates utilities to accommodate the smaller home footprints. Jared Baxter of Baxter Design Group, the project engineer, said the product is a smaller two-car‑garage home previously built in other Anthem units and reintroduced to meet current market demand: “It’s just a smaller footprint that’s being offered to the public at this point in time.”

Commissioners asked primarily clarifying questions. Staff confirmed the density figure discussed (4.3982) applies only to Unit 72, not to the overall Anthem at Merrill Ranch PUD. There was no public comment on this item.

The commission’s motion to approve the preliminary plat was made by Commissioner Woolley and seconded by Commissioner Proehl; the motion passed by voice vote (unanimous among commissioners present).

The approval allows Pulte to proceed to later zoning/site plan steps where final lot layouts, utility relocations and construction plans will be reviewed by town staff and any required technical advisory committees.

Details recorded in the meeting included the unit-specific density, the addition of 27 lots, and the applicant’s commitment that the cottage-style homes will maintain two-car garages and architecture compatible with existing Sun City units.

Next steps for the applicant include submittal of final plats and subsequent site-level reviews and permits before construction can begin.