Citizen Portal

Get email alerts on the Pavement Management topic

No spam. Unsubscribe anytime.

Public works lays out 3–5 year pavement maintenance plan with coordinated bike-and-ped improvements

5967816 · October 3, 2025

Summary

Public Works presented the city's 3- and 5-year pavement maintenance and rehabilitation plan, including treatment methods, an interactive web map and coordination with bicycle-and-pedestrian and ADA transition work. The first-year program includes slurry and micro-surfacing in Terralinda and an overlay of striping improvements and enhanced cross

The City of San Rafael Public Works Department presented a 3- and 5-year Pavement Maintenance Management Plan that maps planned treatments, treatment methods and schedules and aims to coordinate resurfacing with bicycle-and-pedestrian striping upgrades and ADA transition work.

Gray (listed in the presentation as a senior civil engineer) and staff said the planning document will be posted on the city website with an interactive map so residents can search for planned treatments on their streets. The plan schedules crack sealing and localized dig-outs in 2025 and a larger maintenance contract to be bid in winter or spring for work after the rainy season. Treatments indicated for the 2025 slate include accelerated slurry mix and fiberized micro-surfacing in Terralinda and nearby neighborhoods.

Public Works stressed the opportunity to add enhanced striping, high-visibility crosswalks and improved sharrows as resurfacing proceeds. Staff said projects in the paving plan will be coordinated with safe-routes-to-school and other pedestrian improvements to reduce duplication and to incorporate the bicycle-and-pedestrian plan’s recommendations where feasible. The plan will go to City Council for public comment and includes maps that identify specific streets and recommended treatments.

Committee members requested earlier access to full presentation maps before meetings to allow detailed review. Staff agreed to publish the plan and construction documents on the city site and to return to the committee with specifics when designs go to bid.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source