Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Harrington Avenue topic

No spam. Unsubscribe anytime.

Harrington Avenue debris‑rack redesign and floodplain expansion approved for CDBG‑DR application

5837617 · September 25, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council approved submitting a CDBG‑DR application component to redesign the Harrington Avenue debris rack and expand adjacent floodplain on Harrington Avenue to reduce flooding and debris impacts; staff said the proposal was favorably reviewed by the state.

The Barrie City Council on Sept. 24 approved including a Harrington Avenue floodplain expansion and debris‑rack redesign project in the city’s CDBG‑DR package. Staff described the project as an expansion of floodplain along Harrington Avenue and a redesign of the debris rack so that water remains in the channel while debris is captured, which staff said will prevent the rack from directing floodwater into neighborhoods. The project includes acquisition of several properties at the end of Harrington Avenue to accommodate the expanded floodplain. Councilors asked whether widening the floodplain could create constriction downstream; staff explained the project is intended to slow and spread water where practical, reducing peak flow and providing space for debris capture rather than forcing higher flows through smaller openings. Consultants previously worked with the city on hydrologic modeling for similar river‑process projects, staff said, and the Harrington Avenue project was well‑received in the state review comments. The council voted to include the project in the CDBG‑DR application.