Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Huntersville staff open public review of proposed Verhoff Drive alignment alternatives

5841289 · September 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Town staff presented options to revise the adopted Verhoff Drive alignment between NC 115 and Asbury Chapel Road, citing new development, a built bridge segment, and utility constraints; the town will solicit public comment and coordinate with CRTPO and utility owners.

Huntersville staff briefed the Town Board on Sept. 16 about proposed alternatives to the town's adopted Verhoff Drive alignment and said the board will solicit property-owner and public feedback before any formal change is adopted.

Steven Trot, a town transportation staff member, told the board the alignment adopted in February 2002 runs from NC 115 to Prosperity Church Road and that a portion of that alignment (a bridge over the railroad and NC 115) has since been constructed. Trot said recent and proposed developments, along with utility corridors owned by Duke Energy and the Colonial Pipeline, prompted staff to study two possible alternative alignments for the segment between NC 115 and Asbury Chapel Road.

Trot showed a map of the existing…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans