Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

County officials update Fairview on Sandy Boulevard safety plan; construction expected to start in 2027

5788940 · September 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County and consultant staff told the Fairview City Council on Wednesday they received about 400 public responses on the Safe Sandy Boulevard planning effort and have proposed four corridor segments and two cross-section options; construction of the first segment could start in 2027.

Multnomah County staff and consultants updated the Fairview City Council Wednesday on the Safe Sandy Boulevard planning project, including community engagement results, an existing-conditions assessment and draft corridor concepts that will guide design and later construction.

County consultants said Phase 1 outreach this spring and summer included street canvassing, tabling at events, meetings with local organizations (including the school district, Smith Memorial Church, trucking groups and Fairview Terrace HOA) and a public survey that drew about 400 responses. Respondents’ top concerns were roadway condition, missing or broken sidewalks and pedestrian safety; being struck…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans