Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Commission approves septic replacement at 3 Bridge Street after engineer agrees to flood‑impact letter
Summary
Facing limited options to avoid floodplain fill, the commission approved a replacement septic system at 3 Bridge Street after the engineer agreed to provide a stamped letter demonstrating the project will not increase flood elevations; commissioners emphasized removal of a failing cesspit as mitigation.
The Southborough Conservation Commission on Sept. 11 approved an order of conditions for a septic replacement at 3 Bridge Street, contingent on the project engineer supplying a stamped letter certifying that the proposed fill will not increase the flood elevation in the affected floodplain by more than 0.01 foot.
Engineer David Schofield explained the site is extremely tight: he moved the system as far landward as possible, reduced…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

