Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Board delays decision on NRCS headwall design for 24-inch tile after cost estimates of about $19,000–$32,000

5968752 · September 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The surveyor presented NRCS/USDA headwall design options for a 24-inch tile outlet; two construction cost estimates (about $19,000 and $32,000) were provided and the board voted to table the item pending further quotes and investigation.

The Delaware County Drainage Board voted to table a proposed headwall design and associated construction for a 24-inch tile where it daylights into an open ditch north of McGalliard Road. The county surveyor presented a draft design from the U.S. Department of Agriculture’s Natural Resources Conservation…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans