Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Design Review Board requires restoring double-hung windows, preserves front siding at Beagle School at 115 Regent St.
Summary
The board approved restoring the Beagle School’s historic double-hung windows, asked to keep the front siding in place, and postponed decisions on some casement windows pending further building‑code clarification and possible egress solutions; applicants and preservation advocates debated asbestos and lead issues and fire-department egress.
The Beagle School’s application to replace and repair windows and alter exterior siding at 115 Regent Street split the Design Review Board on Sept. 10. After a lengthy presentation by the applicant’s architect and preservation contractor, the board approved restoring the Second‑Floor double‑hung windows and directed that the front siding remain rather than be removed; it left the casement-window decisions to a later submittal pending building‑code clarification.
Architect Artur…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat
