Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Oak Hills to begin bunker replacement next week; aeration postponed by weather

5967881 · October 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Superintendent Jim Schell told the authority that a bunker contractor will begin work next week after sand testing, that aeration was postponed because of weather forecasts, and that bunker replacement on hole 11 could take roughly six weeks; a maple near the cart path on 11 will be removed.

Oak Hills superintendent Jim Schell told the authority that bunker-sand testing is complete, a bunker contractor has dropped equipment and will begin work next week, and that aeration of greens was postponed because of wet and variable weather.

Schell said the sand testing came back acceptable and the contractor’s start date depends on course moisture so equipment does not damage turf. He told…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans