Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the School Zone Traffic Safety topic

No spam. Unsubscribe anytime.

Roselle staff to modify Rodenburg Road parking and add a crosswalk at Waterbury School

5967790 · October 14, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board reviewed proposed changes to parking rules on Rodenburg Road near Waterbury School, including no-parking segments during school hours, standard overnight restrictions and installation of a crosswalk with ADA ramps; striping should occur within about a month and signs will follow.

The Village Board reviewed a staff proposal on Oct. 13 to change parking restrictions on Rodenburg Road near Waterbury School and to install a crosswalk and ADA ramps to improve student and parent safety.

Deputy Chief Gates briefed the board on repeated complaints about parking congestion, vehicles blocking the school bus driveway and sight-line problems during student drop-off and pick-up. Gates cited the Illinois Department of Transportation Bureau of Local Roads and Streets guidance that a two-way road with parking on both sides ideally requires a 36-foot width (10-foot travel lanes plus 8-foot parking lanes), but Rodenburg Road measures roughly 30 feet, so parking on both sides is not feasible.

Staff recommended changing parking restrictions along Rodenburg Road between Waterbury Lane and Darby Lane to prohibit parking on the east side of Rodenburg in the school area, remove parking during school-drop-off hours at specified blocks (between 290 and 330 Rodenburg) and retain standard overnight parking limits elsewhere. The village also plans to install a crosswalk and required ADA ramps across 310 South Rodenburg Road to the median island between the school entrance and exit.

Trustees asked about implementation timing and outreach. Gates said the crosswalk striping should occur within the next month, with public works to follow behind to install signage. Gates confirmed staff will coordinate closely with Waterbury School and the impacted homeowners association to educate residents before citations are issued.

Ending: Trustees signaled consensus for the changes and directed staff to proceed with final ordinance language, signage installation and outreach; the board did not take a final ordinance vote at the Oct. 13 meeting.