Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Wilsonville staff propose higher sewer and stormwater System Development Charges; council to hold public hearing Sept. 15

5880871 · September 5, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City engineers and FCS Group presented a finalized SDC methodology and two updated rate options for sewer and stormwater; staff removed three developer-responsibility lift‑station projects, lowering some charges, and advised a Sept. 15 public hearing for adoption with an effective date of Jan. 1, 2026 if approved.

City Engineer Zach Weigel and consultants from FCS Group briefed the City Council on Sept. 4 on a completed SDC (system development charge) methodology for sewer and stormwater and presented revised maximum defensible charges.

Weigel said the methodology divides SDCs into a reimbursement fee (buy-in to existing capacity) and an improvement fee (cost of future capacity projects), and noted the city can adopt rates up to the maximum defensible level or choose a lower phased-in approach. Using the revised project list, consultants produced a maximum stormwater SDC of about $3,500 per EDU (equivalent dwelling…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans