Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
City staff say 36-inch Brazos River pipeline sizing still adequate; propose VFD pump station
Summary
City staff reported that a 36-inch pipeline installed beneath the Brazos River remains sized for projected demand and described plans for a pump station housing what the speaker called "five 500-horsepower variable-frequency-drive pumps." No formal vote or timeline was recorded in the transcript.
A city staff member reported during the meeting that a 36-inch section of pipeline installed beneath the Brazos River remains large enough for projected future demand and that staff have settled on a pump station design that the speaker described as "five 500-horsepower variable-frequency-drive pumps." The speaker said the pipe had been sized larger than the system then required when it was…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

