The Howard County Drainage Board continued a public‑hearing review of a proposed chapel and event center called Thomas Wedding Estates after neighbors raised drainage and wetland concerns and staff said the stormwater permit had not been issued.
Get email alerts on the Site Plan Stormwater topic
No spam. Unsubscribe anytime.
The Howard County Drainage Board continued a public hearing on a proposed one‑lot subdivision and site plan for Thomas Wedding Estates, a 6.57‑acre venue proposed to include a chapel, event center and parking, after staff said a required stormwater permit had not been obtained and neighbors raised concerns about wetland, ravine and tile drainage.
Why it matters: The developer proposes a 99‑space parking area and an event center designed for roughly 200 people; county staff said the site will drain to a detention basin that discharges under County Road 1150 East to Wildcat Creek. Neighbors said existing drainage runs through a ravine that carries runoff from hundreds of acres and worried that new surface flow could overload or alter farm drainage and aging ravine channels.
At the hearing Tory Tripp, the applicant’s consultant, described changes made after prior comments: the plan reduced parking and added a grass filter strip around the detention area to treat runoff from the lot. Tripp said the drainage will “discharge to a culvert that goes under County Road 1150 East that discharges to the Wildcat Creek,” and that the detention basin will be placed at the southeast corner of the site so site runoff sheets into the basin rather than directly into the ravine.
County staff recommended that any approval be contingent on the stormwater permit being issued: “The only item I have is they have not obtained their storm water permit as of yet. So I would ask that… approval be contingent upon the stormwater permit being approved,” a staff member told the board.
Several nearby landowners spoke during public comment. One neighbor asked whether the project would “cut off” existing drainage paths; another said the ravine and downstream channel have not been maintained in 40–50 years and cautioned the board that the existing channel “may not be good enough” to accept additional surface flow without dredging or reshaping. A farmer and neighbor asked whether drainage tiles installed decades ago would be affected; county staff explained that current county drainage rules require post‑development peak discharge to be reduced compared with historic conditions and that a detention basin holding water and releasing it at a restricted rate is intended to protect downstream landowners.
The board examined application materials and staff review. One board member said she had reviewed the drainage report and civil plans and another said she preferred to continue to the next meeting because the formal site plan was not clearly available on the record for board members. A motion to continue the public hearing to the next meeting carried; the board set the continued public hearing for September 15 and asked staff to verify that the stormwater permit and full construction plans are on file before final action.
Ending: The board continued Thomas Wedding Estates to allow staff to confirm an approved stormwater permit and to give the applicant time to ensure the site plan and drainage documents are in the drainage board’s file. Neighbors will return for the continued hearing and the board will consider any permit conditions tied to wetlands, the detention basin and potential effects on downstream agricultural tiles.