Board approves Culver's site release orifice reduction from 4 to 3 inches

5792567 · September 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Petitioner requested reducing the outlet orifice from 4 inches to 3 inches at a proposed Culver's in Whiteland; the county's outside engineer recommended approval and the board approved the change.

Petitioner representatives told the board on Sept. 2 they seek approval for a Culver's restaurant site in Whiteland that includes reducing the outlet orifice from 4 inches to 3 inches for stormwater release.

Chris McGuire of Macon Building Corporation said the proposal maintains on-site storage sized for a 100‑year event using underground storage and some above‑ground storage; the change to a 3‑inch orifice is intended to control release rates. "The essence that we're asking for this evening is, for the release from a new potential Culver's site in Whiteland... changing the size of the orifice for the release from a, 4 inch down to a 3 inch," McGuire said.

Surveyor Cantwell reported the site had been reviewed by the county's outside engineer with a recommendation of approval and that the discharge location is outside the easement but drains to the ditch. A board member moved to approve the request; the motion carried.

Ending: The board recorded approval subject to the conditions recommended by staff and the outside engineer; no further modifications were discussed at the meeting.