Committee approves $4,716 check valve to protect fire pump backflow after freeze damage elsewhere

5773363 · September 5, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee approved a $4,716 bulletin/PCO to add a check valve on a fire pump backflow line after staff described a freeze-and-flood incident at another school; the valve will be added to future standard designs.

The School Building Committee unanimously approved Bulletin/PCO 010R2, a $4,716 addition to install a check valve on the fire pump backflow line at the North End project, following a description of a freeze-and-flood event at Farmington High School.

Ryan and project staff explained the change was prompted by a recent incident where a backflow preventer froze open during extreme cold and caused a significant flood in a mechanical room. "This was all brought post bid to Kholeronin. They have identified this as definitely, something that's a need and something that will be standard procedure for them going forward," Ryan said.

Justin Hopkins of Tekton Architects described the proposed device as "an additional safeguard" that creates a barrier against cold air entering the backflow preventer; the valve must be opened to flush or drain the system but otherwise prevents air intrusion. Committee members asked technical questions about insulation and heating; staff said the valve is not heated but provides a closed barrier unlike the backflow preventer.

Committee members approved the bulletin unanimously. Staff said the contractor will add the check valve to the North End installation and will pursue a similar price for the Norton project; the Norton price was still being confirmed at the meeting.

The committee recorded the item as a change to standard design practice that the design-build team will include in future drawings.