Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the School Facilities topic

No spam. Unsubscribe anytime.

Riverview board approves Seats Middle School gym renovation, caps project at $231,000

5773160 · March 19, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Riverview Community School District Board on March 18 approved replacement and related work on the Seats Middle School gym floor and equipment, authorizing contracts not to exceed $231,000 from the general fund; the measure passed unanimously with Trustee Toth absent.

The Riverview Community School District Board of Education on March 18 approved a package of repairs and replacements for the Seats Middle School gymnasium, authorizing contracts and work not to exceed $231,000 and funding the project from the district’s general fund.

The board acted after Superintendent Hatzel summarized a request from Grounds and Maintenance Director Kennedy. The district had issued a request for proposals to abate the existing floor and to purchase and install a new playing surface, using Sourcewell cooperative pricing where applicable. The approved authorization included abatement, a new floor, line painting and logos, bleacher removal and reinstallation of existing wall padding, floor covers, and replacement of backboards, rims and hoist systems.

Hatzel told the board the recommended awards and not-to-exceed sums were: environmental abatement to Environmental Maintenance Engineers, $61,600; floor purchase and installation to Sports Floor Refinishing, $99,400; floor lining, logos, bleacher work and related items, $25,000; and new backboard/rim/hoist work, $45,000. The total authorized not-to-exceed amount is $231,000, and the work is scheduled to be performed in 2025. The superintendent described the existing gym floor as “in quite disrepair” and cited the need to abate and replace the playing surface.

Secretary Walker moved the resolution to approve the Seats Middle School gym projects; Trustee Meeks supported the motion. The board took no substantive discussion before the roll call. The motion passed on a recorded vote: President Boer, Vice President Diminsky, Secretary Walker, Treasurer Davis, Trustee Meeks and Trustee O’Brien all voted yes; Trustee Toth was excused.

Votes at a glance

- Acceptance of agenda: Motion by Vice President Diminsky; support by Treasurer Davis. Roll-call: President Boer, Vice President Diminsky, Secretary Walker, Treasurer Davis, Trustee Meeks, Trustee O’Brien — all yes; Trustee Toth excused. Outcome: approved.

- Consent grouping (minutes, check registries, purchase card reports, spring coaching assignments): Motion by Trustee Meeks; support by Vice President Diminsky. Roll-call: Secretary Walker, Treasurer Davis, Trustee O’Brien, President Boer, Vice President Diminsky, Trustee Meeks — all yes; Trustee Toth excused. Outcome: approved.

- Seats Middle School gym projects (abatement, new floor, lining, bleachers/padding work, backboards/hoists) not to exceed $231,000, funded from the general fund: Motion by Secretary Walker; support by Trustee Meeks. Roll-call: Trustee Meeks, Trustee O’Brien, President Boer, Treasurer Davis, Vice President Diminsky, Secretary Walker — all yes; Trustee Toth excused. Outcome: approved.

Why it matters

Seats Middle School serves district athletics and physical education. Replacing an aged or damaged floor involves abatement work before installation, multiple specialty trades and coordination around school schedules; the board’s approval clears contracting and budget authority so the work can proceed in 2025.

Implementation notes

Superintendent Hatzel and Grounds and Maintenance Director Kennedy will proceed with contract awards within the authorized not-to-exceed amounts and schedule the work for 2025. Funding for the project was identified from the district general fund; no state or federal funding source was referenced in the meeting.