Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Contracts topic

No spam. Unsubscribe anytime.

City approves $309,609 CES contract with ASC Construction for two storage buildings at WWRF

5764088 · March 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved a $309,609.34 CES contract with ASC Construction to build two storage structures at the Wastewater Reclamation Facility to protect equipment and materials from the elements.

The Hobbs City Commission approved a CES contract with ASC Construction for $309,609.34 to build two storage structures at the city’s Wastewater Reclamation Facility (WWRF).

City Engineer Anthony Hendry described the project: a 30‑by‑100‑foot enclosed three‑sided building to protect PVC pipe, fire hydrants and other materials (low bid $126,006.59), and a 70‑by‑100‑foot open‑sided heavy-equipment shade structure to store tanker trailers, conveyor trailers, side-dump trailers, a tractor‑truck and a generator trailer (bid $164,005.75 as presented). Hendry said neither structure would have an interior floor because the site already has chip‑seal and asphalt surfaces; both will include soffit or interior lining to deter pigeons and birds.

Commissioner Fields moved to approve the contract; Commissioner Calderon seconded. The roll call recorded Commissioners Smith, Mills, Fields, Calderon, Pinnock and Girth and Mayor Cobb voting yes; the motion carried.

Why this matters: the structures will protect long‑lead and heavy equipment from weather exposure, which staff said reduces damage and preserves inventory for utility operations.

The contract award includes no floor work and relies on existing paved surfaces; staff said the buildings are intended for storage and protection rather than vehicle maintenance.