Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Plan Minor Modifications topic

No spam. Unsubscribe anytime.

Planning board approves minor site‑plan modifications for storefront vestibule and exterior materials

3758160 · March 31, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved minor modifications to a previously approved site plan to replace cedar shakes with metal and to add a small vestibule at a storefront entry; approval was conditioned on prior findings remaining in effect.

The Town of the Wood Planning Board on March 27 approved minor modifications to an existing site plan that will replace deteriorated cedar shakes with new siding material and add a small enclosed vestibule under an existing canopy at a storefront entrance.

The applicant sought the modification after staff and board members identified an unpermitted metal repair where cedar shakes had been removed. Linda Bollinger, representing the applicant, explained the proposal includes matching vertical batten siding at the vestibule, no new lighting or heating, and no increase in gross square footage because the vestibule is located under the existing canopy.

The board approved the site plan dated 02/17/2025 with the condition that all findings and conditions from the original approval dated 10/24/2024 remain in full force and effect except where explicitly modified in the approved changes. The motion to approve was made and passed by the board; the record does not include a roll‑call tally.

Planning board members asked for clarity in construction details on the veneer transition and exterior finish details for later construction review; the board directed the applicant to provide final construction details consistent with the approved drawings prior to permit issuance.