Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Streets And Roads topic

No spam. Unsubscribe anytime.

Council authorizes RFP for citywide surface improvement project estimated at $750,000

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council authorized staff to release an RFP for a surface improvement project covering curb ramp accessibility upgrades, valve and monument box replacement, crack sealing and rubberized cape seal on multiple streets; the engineer’s estimate is $750,000 funded by SB 1 and Measure L funds, with no general fund dollars used.

The Waterford City Council authorized staff to prepare and release a request for proposals for the Surface Improvement Project (Project No. 2025-042025), which includes accessibility upgrades and pavement work on several local streets.

Public Works presenter Mr. Stetscher said the scope includes concrete accessibility upgrades to curb ramps (ADA compliance), replacement of valves and monument boxes, patch paving, crack sealing, application of a rubberized cape seal and roadway striping. Streets included in the work list are Blarney Drive, Brigadoon Lane, Cherry Drive, Floraway, Forestall Lane, Loch Ness Drive, Pomona Street, Randy Lane and Court, Becky Way, Kuran Drive and Court, The Drive, Tweed Drive, and Randy Court.

The engineering estimate for the project is $750,000; the presenter said the project will be funded by SB 1 and Measure L funds and will not use general fund dollars. Staff asked the council to authorize preparing and releasing the RFP; no public speakers commented on this item and the motion to issue the RFP passed unanimously 4-0.

Staff said the RFP will be released for a 30–40 day bid period, with subsequent award and construction in summer months. Council members and residents asked about timing for specific streets (Washington and Welch were noted as high-priority needs for future work).