Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Commercial Permit Approval topic

No spam. Unsubscribe anytime.

Planning commission approves exterior colors and interior bar top for 512 S. First St.

3310243 · May 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved exterior color changes and an interior bar top for the business at 512 South First Street and told applicants to return with final sign plans for separate review.

The La Conner Planning Commission opened a public hearing on LU 25-17 (512 South First Street) and approved exterior color changes and an interior bar top for the business occupying that address. The commission required a separate submittal for the final sign design, asking the applicants to return with finalized sign details for review and permitting.

Applicants described the scope as painting the storefront area shown in the packet, adding a flat (non-projecting) sign, and installing an interior bar top approximately 12 by 5 feet. Staff reminded the commission that interior changes (for example, a bar top) are typically reviewed by the county for building-code compliance, but the commission evaluated the consolidated package presented for exterior appearance and signage location. The applicants said they may use the patio with an entrance from the boardwalk and discussed the possibility of live music; staff advised that any entertainment would require appropriate licenses (for example, a cabaret or similar entertainment permit).

Commissioners moved to approve the colors and the interior bar top as presented; the motion carried with the commission's recorded "aye" votes. Staff instructed the applicants to return to town hall with a finalized sign plan so the technical sign permit can be processed separately. The applicants said their target opening is mid‑June.