Summary

Public works staff told commissioners there are 541 local access road (LAR) segments in Lane County — about 23.8 miles total — including 167 segments inside urban growth boundaries. Staff recommended targeted annexation and further analysis, citing limited county road funds and large unmet capital needs.

Lane County public‑works staff told the Board of Commissioners on April 29 that local access roads — a patchwork of public roads built historically by private developers — present funding, maintenance and jurisdictional challenges and recommended work with cities to identify annexation and jurisdictional‑transfer candidates.

"Local access roads are confusing for us and for a lot of people. They are public roads but they are not county roads or state roads or city streets," said Orin Schumacher, Road Maintenance Manager with Lane County Public Works, explaining state statute and the roads’ historic origins.

Staff briefed commissioners on the scale and options: - Lane County has 541 LAR segments totaling roughly 23.8 miles of roadway; about 167 segments lie within city urban growth boundaries (UGBs). Segments often appear piecemeal and may be contiguous or isolated. - LARs were typically built 60–100 years ago to provide lower‑cost access for subdivisions and generally do not meet county road design standards, producing substantial deferred maintenance costs. - County staff said county road funds are tightly restricted by statute; county road funds may be used only for emergencies on LARs and general fund dollars would be required for non‑emergency repair programs.

Staff and commissioners discussed policy options. Staff recommended two parallel analyses: (1) identify LARs within UGBs suitable for annexation to cities so the roads would become city streets on annexation, and (2) evaluate LARs outside UGBs that could become county roads. The recommendation emphasized collaboration with Eugene and Springfield staff on priorities and grant targeting.

Funding context presented by staff included projected shortfalls: a County presentation estimated a statewide 60% shortfall for pavement preservation and a greater than 70% shortfall for capital construction projects; local estimates showed Lane County could face a drop in its pavement‑condition index to about 76 by 2028 absent additional funding. Staff noted chip‑seal application costs run roughly $35,000 per mile for the surface treatment alone, exclusive of substructure repairs, culvert replacement or other pre‑treatment needs.

Commissioners and staff also discussed alternatives used elsewhere, including special road districts and local improvement districts (statutory mechanisms that enable local taxing and maintenance), and the equity concern that homeowners in unincorporated areas outside UGBs would expect similar treatment.

Next steps: staff recommended further analysis and a coordinated outreach effort with city partners. Several commissioners asked staff to bring the issue to a joint elected‑officials meeting with City of Eugene representatives within the next six months to seek cooperative pathways, and to prepare options for prioritization that factor emergency response needs.