Select Board authorizes $305,801.04 contract for White Rock Falcon Way intersection work

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Select Board authorized Town staff to sign a revised $305,801.04 construction contract for the White Rock Falcon Way intersection project (project 24045) after negotiating to bring the bid under the FY24 appropriation.

The Bow Board of Selectmen voted May 13 to authorize town staff to sign a revised construction contract with Michelle Belangeron Construction Services LLC for the White Rock Falcon Way intersection project (project number 24045) at a contract price of $305,801.04.

Town staff reported the original bid came in higher; DPW staff and the project engineers worked with the contractor to reconsider some line items and reduce scope or methods where feasible so the project would fit the existing appropriation. The Select Board packet shows the FY24 project appropriation at $361,600. The board noted about $37,000 has already been spent on design and bidding; board members said the revised contract amount keeps the project within the overall appropriation.

A motion to approve and authorize David to sign the contract was made and seconded, and the board approved the authorization by voice vote. The board noted some scope and schedule adjustments (including material changes and a reduced police detail) were part of the negotiated savings, but the contractor will complete the revised scope under the new contract amount.

The board also authorized related administrative steps — including any necessary road‑closure coordination tied to construction — and confirmed staff would execute the contract under the revised terms.