Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Home Workshop Expansion topic

No spam. Unsubscribe anytime.

BZA approves Hostetler rear-yard variance for woodworking business addition

3288221 · April 28, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a variance to reduce the rear-yard setback from 20 feet to 8 feet to allow a 30-by-36-foot addition for an existing woodworking business previously approved as a home-based business.

The Marshall County Board of Zoning Appeals on May 13 approved a variance reducing the rear-yard setback from 20 feet to 8 feet so Norman (Elaine) Hostetler can add a 30-by-36-foot building with a 16-by-30-foot loft to an existing woodworking operation.

Planning staff identified the operation as a home workshop (Article 6, Section 110 of the Marshall County zoning ordinance) and recommended approval, noting the addition is consistent with the rural-agricultural character of adjacent properties, several of which have outbuildings. The Technical Review Committee recommended approval conditioned on health department sign-off.

Hostetler told the board the extra width would allow pallet and cantilever racking and safer truck unloading; he said deliveries by tractor-trailer sometimes require easier maneuvering and that he could explore a driveway-use agreement with a neighbor if needed. Staff noted that accessory buildings for home workshops are limited to 4,000 square feet; the planning review identified that some permitted additions already exceed that limit and recommended a positive evaluation of current operations as part of the approval.

Trent moved to approve the variance with staff conditions; Don seconded and the motion carried by voice vote.