Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Uxbridge picks Pout Pond for NPDES demonstration BMP; Natural Heritage finds no take

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Town of Uxbridge Department of Public Works presented plans to repave the Pout Pond parking area and install two bioretention basins as a demonstration NPDES Phase II BMP; Natural Heritage issued a finding of no take for state-listed species.

The Town of Uxbridge Department of Public Works told the Conservation Commission it has selected the Pout Pond parking area for a demonstration structural best-management practice required by the town’s NPDES Phase II obligations. Jean Christie, principal engineer representing the Uxbridge DPW, presented a plan that repaves the existing parking lot and installs two bioretention basins designed to remove phosphorus and meet the demonstration requirement.

Christie said the site-selection process reviewed town-owned parcels and prioritized locations that could host an educational demonstration accessible to the public. The proposed plan locates 1 bioretention area near the pond and 1 nearer West River…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans