Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Drainage Flooding topic

No spam. Unsubscribe anytime.

Commission to ask DPS to investigate flooding on east-side bike path near Pay Bridge

3275976 · April 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Commissioners discussed a recurring flooding issue on the east-side bike path just south of the Pay Bridge and north of Horsenelle. They agreed to ask DPS to investigate drainage and culvert conditions and to add the issue to the meeting follow-up list.

Commissioners raised a recurring flooding problem on the east-side bike path south of the Pay Bridge and north of Horsenelle, where heavy rain and snowmelt leave the path impassable.

Why it matters: standing water prevents safe passage for bicyclists and pedestrians and may indicate clogged culverts or drainage problems affecting adjacent yards.

A commissioner described the situation as longstanding; residents said both the homeowner’s yard and the adjacent bike path flood during heavy precipitation. Commissioners discussed options, including inspecting ditches and culverts, checking for clogged inlets and coordinating with Wayne County if the drainage crosses county right-of-way. One commissioner noted a recent driveway replacement included a new culvert where the path is concrete, which may partially address the issue.

The commission directed staff to ask Derek at DPS to investigate the flooding, determine whether the problem is a maintenance issue or needs larger corrective work and document findings in meeting minutes for follow-up.