Concord disability commission hears accessibility plan from Concord Center for the Visual Arts; takes no action
Summary
Landscape designer Kristen First presented a renovation plan for the Concord Center for the Visual Arts that would add and relocate ramps and handrails; the commission offered guidance, urged coordination with the building inspector and Mass AAB filings, and recorded that it would take no formal action at this time.
Get email alerts on the Accessibility Handrails Variance topic
No spam. Unsubscribe anytime.
Kristen First, a landscape designer working for the Concord Center for the Visual Arts, briefed the Town of Concord Commission on Disability about a renovation that will remove a rear classroom, add a larger classroom, and alter exterior ramps and handrails to improve accessibility.
The presentation matters because the project affects public access at the Center’s Lexington Road frontage and raises a conflict between Massachusetts accessibility regulation (521 CMR) and the Historic District Commission’s aesthetic preferences. Members urged the applicant to clearly identify the accessible route to the building, consult the town building inspector, and file for variances with the Massachusetts Architectural Access Board (AAB) where required.
First told the commission the interior of the renovated building will meet accessibility requirements but that exterior routes need updating. “Hi. My name is Kristen First. I'm a landscape designer, and, I am working for, Concord Centre for the Visual Arts,” she said, and described plans to relocate the front ramp slightly, build a new rear ramp and handrails, and expand an entrance to the new classroom. She said the project team is proposing single-height handrails at the redesigned front ramp rather than the double-height rails called for in some state guidance, and that the Historic District Commission had objected to earlier handrail designs on aesthetic grounds.
Commission members explained the regulatory balance. Jennifer (commission member and former HDC chair) summarized the legal framework: “The ADA is a federal and a state law. Right. There's there's no, there there's no that's very clear.” Commissioners noted that federal accessibility requirements and 521 CMR can differ (for example, whether a lower secondary rail is required), and that not every door must be fully accessible so long as the building provides an accessible route to its programs. Members encouraged First to identify the accessible route clearly on the plan—a single dashed line from accessible parking or drop-off to the accessible entrance—and to show which route the town-maintained sidewalk and crushed‑stone public way will support in good weather.
Speakers also raised practical issues the project team should address: the crushed-stone public way on Lexington Road becomes muddy in bad weather and often drives visitors to use the rear driveway entrance; the rear ramp will meet full 521 CMR handrail requirements; the front ramp is being improved but the applicant plans a single top rail for aesthetic reasons; and the project team should consider signage or website directions to tell visitors which entrance to use. Kristen said the organization will file required variance paperwork with the state and the local HDC and that the project already has an earlier variance on file dating roughly to an application in 02/2009 and a grant around 02/2011 (dates provided by First with uncertainty).
The commission recorded no formal vote on the redevelopment at this meeting and noted that it will not take action at this time; the chair said, “We we are taking no action at this time.” Commissioners offered to help by consulting with the building inspector, providing feedback on accessible‑route diagrams, and, if requested, reviewing drawings before the applicant pursues state review. First agreed to submit an accessible‑route diagram and to consult further with town staff and the HDC.
The commission also recommended clarifying visitor directions—such as indicating the accessible entrance on the Center’s website—and noted the project team should be prepared to explain which route they consider the required accessible route when they meet with the building inspector or apply to the AAB.
The item closed with the commission asking the applicant to return with a clear plan and accessible‑route diagram; no permit or variance decision was made at this meeting.