Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use Rv Park topic

No spam. Unsubscribe anytime.

Clay County court rejects final plat for Corner Post RV Park after residents raise safety, water concerns

3128904 · March 31, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Clay County Commissioners Court voted 5-0 to deny approval of the final plat for Lot 1 of Corner Post RV Park after residents and county staff raised concerns about setbacks, drainage, groundwater and emergency access. The applicant and surveyor said they will revise the plat and return at the next court meeting.

Clay County Commissioners Court voted 5-0 to deny approval of the final plat for Lot 1 of Corner Post RV Park after multiple residents raised safety and water-supply concerns and the court identified missing or unclear engineering items.

The court, meeting at the Clay County Courthouse, heard public comment from nearby residents and technical responses from the developer’s surveyor and the property owner before voting. Heather Martin, a resident who said she lives at 736 Reed Road, told the court, “I have so many concerns about the RV park,” and cited the site’s location on a curve, past flooding on the property and uncertainty about whether the proposed sewage system could handle full capacity. Carolyn Cantwell, who said the park would be “right in front of my property,” said she runs a 75-head cattle herd on her land and expressed concerns about water availability and fire risk.

Jason Swain, who identified himself as the engineering surveyor of record for "Mr. McGry," told the court the septic system is permitted through the state and that several items on the county’s checklist are “simple fixes.” The property owner, who identified himself in the meeting as Mr. McBride, described the planned park as intended for “10 to 12 retired people” and said he planned landscaping, background checks for tenants and optional water storage tanks if needed.

Court members and staff noted several technical and regulatory concerns. County staff and one commissioner said setbacks in the county rules and state guidance — referenced in the discussion as a 25-foot and a 50-foot setback depending on the feature — were not clearly reflected on the current plat and needed to be accommodated. The court also discussed whether a groundwater study must be provided or whether a variance would be required; staff said the county may grant a variance but that a formal request would need to be filed and decided by the court. Commissioners emphasized the county’s practice of holding subdivisions to the groundwater-study requirement and said they were hesitant to begin granting variances without more information.

Commissioners also asked the applicant to address emergency access and fire protection given that the parcel has a single exit. Staff suggested the applicant consider an on-site water storage tank for fire protection and noted that county fire-code requirements vary by population and may be different from larger neighboring counties.

After reviewing a checklist from county staff and the outstanding items identified by county counsel and the county engineer, Commissioner Jack moved to deny approval at this time; Commissioner Ben seconded the motion. The court voted 5-0 against approving the plat. The court directed the applicant to supply the missing items (including a groundwater availability/study or a formal variance request, revised setbacks on the plat, and clarifications about drainage, septic and proposed structures) and to return to the court on April 14 (the applicant committed to meeting that timeline).

The court also encouraged community members interested in forming a groundwater conservation district to research the statutory process and, if inclined, pursue the citizen-driven petition and legislative steps needed to create such a district. The court noted that creation of a conservation district is separate from the court’s permitting role and would require action by residents and the state legislature.

The court’s denial was a procedural decision tied to missing or unclear items in the application; no permit or plat was recorded as approved. The applicant said he would revise the plat and supporting studies and return at the next scheduled meeting.