Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Utilities Infrastructure topic

No spam. Unsubscribe anytime.

Council approves $299,916 engineering contract for groundwater-surface water interconnect project

3050770 · April 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council authorized a professional-services agreement with TRC Engineers, Inc. for design, bidding and construction-phase engineering related to an 18-inch interconnect between surface water and groundwater systems; staff recommended approval.

The council approved a resolution authorizing the city manager to execute a professional services agreement with TRC Engineers, Inc. for engineering services related to a groundwater–surface water interconnect project.

Terry (city staff) said the project will install a new 18-inch water line to connect the surface-water system under construction near New Braunfels Street and Eighth Street to the lower-pressure groundwater plane. The interconnect will allow transfers between groundwater and surface-water supplies within the distribution system.

Staff presented a TRC proposal priced at $299,916 covering design, bidding and construction-phase services. Terry recommended approval. Councilmember Raya moved the resolution and Councilmember Carlson seconded; the motion passed on a voice vote.

No additional funding or bond actions were announced at the meeting; staff recommended the agreement to support current construction coordination and system reliability efforts.