Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Design Review Board approves paint and storefront updates for building at 114 W. Third St.

3049911 · March 25, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a façade plan that keeps the ground-floor brick and repaints the upper floors in a ‘rugged brown’ tone, with additional storefront and trim work to be returned for final details.

The Davenport City Design Review Board approved a facade refurbishment at 114 West Third Street, submitted by R3 Roofing and Exteriors, that retains the existing lower red brick while painting upper floors in a sample referred to as “rugged brown.” The board approved the applicant’s submitted work write-up and materials.

Staff displayed site maps, photos, and color samples. The project scope included…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans