Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Lake Lucille Park topic

No spam. Unsubscribe anytime.

Lake Lucille Park to get trail upgrades and expanded parking; $37,500 grant proposed for improvements

2969271 · March 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff told the Parks and Recreation Advisory Commission on March 12 that a $37,500 Mat-Su Trails and Parks Foundation grant is proposed to upgrade a trail at Lake Lucille Park and that recent parking realignments increased capacity and improved drainage.

City staff reported March 12 that a $37,500 grant from the Mat-Su Trails and Parks Foundation is scheduled to be presented to the Wasilla City Council for appropriation and would fund construction and equipment rental to upgrade a trail segment at Lake Lucille Park.

Scott Powell described the trail project as intended to address steep grade changes between the soccer fields and an old amphitheater and to make the path closer to ADA standards so more users can access the lake and boardwalk. Deputy Public Works Director Robert Walden walked the trail with foundation members and recommended the priority.

Staff also presented photos and diagrams of recent parking realignments at Lake Lucille. The largest lot near the soccer fields was reconfigured with flow arrows and an estimated capacity of roughly 200 parking places; a second lot near the back campground (Bow Range area) was realigned to add an estimated 48 spaces and improved drainage; and a lake-adjacent lot was widened and realigned for trailers with roughly 32 spots and ADA-compliant parking at the boardwalk access. Staff said they have placed rock base and will top with asphalt after settling.

Powell and Parks Supervisor Jess described campground upgrades: removal of trees that left poorly graded tent sites, revised campsite layout for family recreation rather than long-term informal occupancy, salvaged playground surfacing, and plans to attract higher-quality camp hosts. Staff said about half of the campground’s electrical hookups provide power to RV sites (staff estimate). The city is exploring adding a dump station and other amenities to make the campground more attractive.

Powell said the city has been coordinating parking, drainage and campground improvements with stormwater projects and noted the recent work was intended to support larger events held at Lake Lucille, including dog events, LARP weekends and campouts.

Why it matters: The trail upgrade grant and parking realignments improve access and event capacity at a key city park; the campground changes are intended to reduce long-term occupancy and support family recreation.