Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Applicant revises 325 College Ave. design after code review; project now as‑of‑right under recent zoning changes

2963152 · April 11, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Project team for 325 College Ave. presented minor massing and floor‑height changes after building- and fire-code coordination, added a second stair, removed a corner inset, and added sensor lighting; board asked for before/after elevations and confirmed several preliminary conditions will remain on the final approval.

The project team for a proposed redevelopment at 325 College Ave. presented minor design revisions at the City of Ithaca Planning and Development Board Project Review Committee on April 11, saying changes were driven by coordination with building- and fire-code reviewers and by recent zoning updates.

Annie, project representative for the 325 College Ave. redevelopment, said the design now includes a second stair after consultation with the fire and building departments, noting “we had to add another stair to the building.” She said the design eliminates a previously proposed inset at a building corner, and that the project team raised the typical floor‑to‑floor height from about 9 feet 6 inches to 10 feet to align with zoning and code requirements. “We will bring this building to a full compliant at a 10 foot floor to…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans