Commission approves $2.2 million for Daniel Boone High School HVAC replacement
Summary
The commission approved a recommendation to authorize up to $2.2 million from education capital funds to replace the failing geothermal exterior heat-exchange system at Daniel Boone High School with a boiler and chiller system.
Washington County commissioners approved resolution 25-03-06, authorizing up to $2,200,000 in education capital project spending in fiscal year 2025 to design, engineer and construct a new boiler-and-chiller system for Daniel Boone High School.
Director of Schools (presenting staff) explained the project as a replacement for an aging exterior geothermal heat-exchange system that is failing; the county’s previous internal HVAC upgrades at high schools used ESSER dollars for internal systems, but this request covers external equipment conversion to a standard boiler and chiller installed outside the building.
Commissioner Carter presented the Health, Education and Welfare committee’s recommendation. The commission approved the resolution on a recorded vote of 11 yes, 4 absent.
County staff and the director said the project replaces failing infrastructure and would be designed to current efficiency standards; further project details and contract documents will be presented to the commission as procurement proceeds.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

