Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Meeting Roundup topic

No spam. Unsubscribe anytime.

Votes at a glance: Alpharetta Design Review Board, March 25, 2025

2758894 · March 25, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Summary of formal motions and votes taken by the Alpharetta DRB on March 25, 2025, including major approvals and follow-up requirements.

The City of Alpharetta Design Review Board took a sequence of formal votes at its March 25 public hearing. Below is a concise list of motions recorded on the transcript, the outcome, and immediate follow-up tasks.

- Approval of February 21, 2025 meeting minutes — Motion to approve carried 5–0. (Mover: Mr. Owens; seconder: Ms. Sprayberry.)

- Kingsley (296 & 304 Thompson Street; DRB 240048) — Motion to approve elevations and materials for Lots 1 and 7 and townhome materials; Lots 2–6 and 8–11 to be substantially similar with staff final approval. Outcome: approved 5–0. Follow-up: staff to administratively review later facade/color submittals.

- 244 North Main Street (rowhomes) — Motion to approve elevations and materials with per-unit brick assignments and a condition that northern elevations on Lots 1, 4 and 11 be revised for more visual interest; applicant to work with staff on final details. Outcome: approved 4–1. Follow-up: applicant to submit revised elevations to staff for approval.

- Hudson Park (193 Canton Street; DRB 250001) — Motion to approve elevations and materials with conditions that AC units be screened, a physical sample of the “natural” brick be submitted to staff, and paint-swatch labeling be clarified. Outcome: approved 4–0 (one board member recused). Follow-up: applicant to deliver brick sample and equipment-screening plans to staff.

- Providence Partners (204 Marietta Street; DRB 250011) — Motion to approve elevations and materials and site plan with condition that the parapet/address band receive additional architectural attention; applicant to work with staff on signage. Outcome: approved 5–0. Follow-up: applicant to refine parapet and submit photometrics to staff.

- Same applicant — Photometrics delegated to staff for approval. Outcome: approved 5–0.

- Same applicant — Landscape plan deferred for revision; applicant to address council and board comments. Outcome: approved 5–0.

- Stonewood Village (main building; DRB 250008) — Motion to approve elevations and materials as presented. Outcome: approved 5–0.

- Stonewood Village outparcel (DRB 250009) — Motion to approve outparcel site plan with condition: add an east-side man door to the dumpster enclosure with a walkway to the rear exit. Outcome: approved 4–0 (one recusal). Follow-up: applicant to add man door detail to revised site plan.

- Stonewood Village landscaping — Motion directing applicant to work with staff to rearrange tree spacing to avoid overplanting on the west side while preserving overall tree count. Outcome: approved 4–0. Follow-up: applicant to submit revised landscape plan.

- True Education (signage) — Motion to approve building sign and blade sign with the blade sign painted blue in the background and matching blue bracket. Outcome: approved 5–0.

- Maple Street Biscuit (signage) — Motion to approve proposed signage as presented. Outcome: approved 5–0.

What this means: The board cleared several building elevations and site plans for the downtown area while reserving landscape and lighting details for staff-level review to ensure final compliance. Several items require applicants to return materials (brick sample, revised elevations, landscape updates, photometrics) before final permits will be issued.

If you are tracking a specific application from this meeting, check the project DRB number and contact Alpharetta Planning staff for the administrative follow-ups noted above.