Wilson County stormwater staff urges plat signature, site assessments for lots over 5 acres and proposes fee increase

2734273 ยท March 22, 2025

Get AI-powered insights, summaries, and transcripts

Subscribe
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Stormwater staff told the Urban Top Facility Board that lots larger than 5 acres frequently avoid stormwater review, creating 'critical lots' that can require engineered designs; staff proposed a plat checklist, a stormwater signature on plats over 5 acres, and raising review fees to recover engineering-review costs.

At the March 13 Urban Top Facility Board meeting, stormwater staff raised concerns that parcels larger than 5 acres routinely avoid county stormwater review and can become