Design preview: Sandy River linear park to include timber playlets, water pump feature and small amphitheater

2733642 · March 20, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff and community discussed play equipment and access as designers finalize three 'pocket' play areas and site amenities for the Sandy River linear park (soon to be Sharon Nesbitt Heritage Park); no formal vote was taken.

Designers and staff presented details of play components planned for the Sandy River linear park — the project the city expects to bring to council for a naming resolution on April 8 — and committee members and residents discussed access, dog use, and safety near the river.

The park design divides the linear site into three pocket play areas (north, central and south) with natural‑material play elements described as “Timberform” stack climbers, a bird‑nest seating feature, a timber water‑pump table and a wide slide set into boulders. The design also includes a small amphitheater near the river, winding paths through meadow and tree plantings, and a plan for light poles chosen to match downtown fixtures.

Resident Frank Stevens, who works with Friends of Trees and volunteers on local trail stewardship, urged committee members to benchmark practices used by Oregon Parks and Recreation for trail access control, trash management and safety near river access points. He also suggested early coordination on parking and a shuttle hub at the mall that could affect demand near the new park.

Committee members asked detailed questions about site orientation, surface materials, lighting, emergency vehicle access and whether any of the planned water features would use potable water. Jonah Jacobson said the pump table will run on city drinking water and confirmed designers have specified trees and shrubs to shape access patterns to the river. Members discussed dog access and the desirability of including dog‑friendly fixtures such as pet bowls at water stations; staff said they would inquire with contractors about including dog bowls with fountain purchases.

Several members noted seasonal flooding and river currents near the railroad bridge; the committee emphasized signage and safety outreach where users may attempt to access rocky channels or an island near the river. No formal vote was taken; staff said construction targets later in the year but acknowledged timelines may shift.

Background and timing: staff said the park’s name resolution will appear on the April 8 city council consent agenda and that the city is targeting late summer or fall for opening, though staff cautioned that schedule could slip.