The Development Review Committee granted conditional final approval for Cortland Townhomes Phase 1, a 34-unit project at 400 East and 200 North, requiring private street names, waterline looping or council approval, resolution of addressing and utility redlines, and a mitigation plan for a mountable center island.

The Development Review Committee on Aug. 12 conditionally approved final plans for Phase 1 of the Cortland Townhome subdivision, a 34-unit development north of the Macy’s grocery and commercial area at 400 East and 200 North, subject to addressing redline comments and agreement conditions. The committee said the approval is conditional to ensure addressing and plat redlines are resolved, required private street names are provided for interior drives, and the applicant addresses utility routing and traffic island treatments specified by staff. City planners said the project previously received preliminary approval from the planning commission and that this hearing addressed final DRC approval. Aspen (planning) told the committee an architectural review committee (ARC) review will be required before construction when elevations are available. Randy (building) and staff flagged that interior drives serving units should have private street names so addresses are clear and to avoid future addressing conflicts. Fire and public-safety staff discussed hydrant placement and circulation. Ryan (fire) confirmed two interior hydrants on the utility sheet and asked that private-drive names be provided so emergency responders can locate units. Police staff questioned the need for a mountable center island at the subdivision entrance; they said residents may still make left-hand turns over a mountable curb and that calls to police could increase if drivers ignore the design. City staff explained the island was included because the access point is within the MUTCD-recommended clearance distance from the protected right-turn lane at the 200 North intersection, and because future corridor improvements are planned as part of the master plan. Engineering discussed a dead-end culinary water line in the project that measures about 550 feet, exceeding the city code maximum of 500 feet for a dead-end main without council approval. Staff said the developer can either loop the waterline back to 200 North now or seek city council approval to exceed the 500-foot guideline (the city may allow up to 750 feet with council approval). Jason (engineering/planning) noted looping in phase 1 would add approximately 130 feet of pipe in one option but may avoid a council waiver. Staff also noted trenching and utility work in 200 North will likely trigger an eventual overlay of that roadway. The committee said an all-weather surface must be maintained for winter operations; the overlay can be postponed to the next spring provided a suitable trench repair and all-weather surface are in place for snow operations. The committee moved and seconded a motion to approve the final application contingent on city redlines being addressed and on the development agreement requirement that any amenities required for Phase 1 be installed. The motion passed on a voice vote; the record shows no roll-call tally. The committee will send redline comments to the applicant and coordinate bonding and a pre-construction meeting. Applicant coordination items include submitting ARC elevations, confirming private street names, producing a PLSS clearance/PLSS certificate from the county, and finalizing the waterline loop or seeking council approval if the dead-end length remains over the code threshold.