Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Contractor outlines tower conditions, urges maintenance program for Willard water tanks

5604675 · July 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Viking Industrial Painting presented photos and a maintenance-based contracting model to Willard's advisory board, recommending routine inspections, washouts every three to five years and a multi-year maintenance contract to extend coating life and reduce emergency repairs.

Matt Schultz, supervisor with Viking Industrial Painting, presented a condition assessment of Willard's three water tanks and urged the advisory board to adopt a maintenance-based approach to tank care rather than one-off repairs.

Schultz said the company inspected the town's lake tank near the school and the tank across from the public works shop and provided hundreds of photographs and technical notes. Schultz told the board the interior of tanks must be blast-cleaned to near-white steel and receive a zinc-rich primer and epoxy system; on the exterior, he said coating systems can be overcoated only for a limited period and that planning and prep work are critical to long life.

Wh…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans